Home » Tenders » Active Tenders

Active Tenders

ID Subject Date & Time If Updated Download
20170056Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers,Thick Web Switches and Special Sleepers) S&T and OHE & General Electrical Work in connection with Extension of MMTS Phase-II (Tripling) from Ghatkesar (Km. 213.840) to Raigir (Yadadri) (Km. 246.230) on Secunderabad Kazipet Section of Secunderabad Division of South Central Railway, Telangana State, India (33 Kms). Opening Date for Sale
12-09-2017

Closing Date
& Time for Sale

31-08-2018
05.00 PM
 


28-06-2018

Download File
20170057

Project Management Consultancy for “Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers, Thick Web Switches and Special Sleepers) S&T and OHE & General Electrical Work in connection with Extension of MMTS Phase-II (Tripling) from Ghatkesar (Km. 213.840) to Raigir (Yadadri) (Km. 246.230) on Secunderabad – Kazipet Section of Secunderabad Division of South Central Railway, Telangana State, India (33 Kms)”.

Opening Date for Sale
15-09-2017

Closing Date
& Time for Sale

08-08-2018
05.00 PM
 


26-04-2018

Download File
20170058

Detailed Design and Project Management Consultancy for construction of tunnels, bridges, and formation works from chainage 18+444 to 33+907 (15.463 km) under package-2 in connection with new single line broad gauge rail link between Rishikesh and Karanprayag (125km) in the state of Uttarakhand, India. RFP No./RVNL/RKSH-KNPG/2017/DD&PMC/PK-2 dated 12.09.2017

Opening Date for Sale
18-09-2017

Closing Date
& Time for Sale

07-08-2018
05.00 PM
 


20-07-2018

Download File
20170059Detailed Design and Project Management Consultancy for construction of tunnels, bridges, and formation works from chainage 63+460 to 73+018 (9.558km) under package-5 in connection with new single line broad gauge rail link between Rishikesh and Karanprayag (125km) in the state of Uttarakhand, India. RFP No./RVNL/RKSH-KNPG/2017/DD&PMC/PK-5 dated 12.09.2017Opening Date for Sale
18-09-2017

Closing Date
& Time for Sale

30-07-2018
05.00 PM
 


29-06-2018

Download File
20180047

PROJECT MANAGEMENT CONSULTANCY FOR CONSTRUCTION OF ADITS A1 (307m long), A2 (573m long) AND A3 (942m long) IN CONNECTION WITH NEW SINGLE LINE BROAD GUAGE LINK BETWEEN RISHIKESH AND KARANPRAYAG (125KM) IN THE STATE OF UTTARAKHAND, INDIA. IFB No: RVNL/RKSH-KNPG/TENDER/ADITS/1/PMC

Opening Date for Sale
23-05-2018

Closing Date
& Time for Sale

18-07-2018
05.00 PM
 


05-07-2018

Download File
20180050“Construction of PEB Sheds, Structures, Buildings, Water supply arrangement, Drainage, Sewerage, Road works, Rail track works, Signaling & Telecommunication works, OHE and Power supply arrangements, General Electrical works and Supply, Installation and commissioning of Machinery and Plant in connection with setting up of Rail Coach Factory at Latur, Maharashtra (India)”Opening Date for Sale
31-05-2018

Closing Date
& Time for Sale

13-07-2018
05.00 PM
 


18-06-2018

Download File
20180051BALANCE OUTDOOR SIGNALLING & TELECOM WORKS IN CONNECTION WITH DOUBLING BETWEEN SHADHORAGAON TO BINA (95.50KMs) And MAHADEVKHEDI TO KAROD OF BHOPAL DIVISION OF WEST CENTRAL RAILWAY IN THE STATE OF MADHYA PRADESH, INDIAOpening Date for Sale
01-06-2018

Closing Date
& Time for Sale

25-07-2018
05.00 PM
 
Download File
20180052MANUFACTURE AND SUPPLY OF CURVED SWITCHES WITH ZU-1-60 THICK WEB TONGUE RAIL AND UIC 60kg/m (GRADE 880) STOCK RAIL CONFORMING TO INDIAN RAILWAYS SPECIFICATIONS IRS-T-10-2000 (READ ALONG WITH LATEST AMENDMENTS) FOR VARIOUS RAILROAD PROJECTS IN DIFFERENT REGIONS OF INDIA. Opening Date for Sale
01-06-2018

Closing Date
& Time for Sale

24-07-2018
05.00 PM
 


03-07-2018

Download File
20180053

CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES, SERVICE BUILDINGS INCLUDING MISCELLANEOUS WORKS & GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN TINAIGHAT [KM.11.575] [INCLUDING]AND CASTLEROCK [KM. 24.600] [INCLUDING] ON HUBBALLI DIVISION OF SOUTH WESTERN RAILWAY IN KARNATAKA STATE, INDIA. RVNL/Bangalore/TGT-CLR/OT/2/2018 dt. 12.06.2018

Opening Date for Sale
12-06-2018

Closing Date
& Time for Sale

26-07-2018
05.00 PM
 


09-07-2018

Download File
20180054EXECUTION OF RAILWAY ELECTRIFICATION OF BHIGVAN - SOLAPUR 160 RKM / 385 TKM AND SOLAPUR – GULBARGA 113 RKM / 261 TKM (SECTION OF PUNE-WADI-GUNTKAL RE WORK) SECTION IN SOLAPUR DIVISION OF CENTRAL RAILWAY, IN THE STATE OF MAHARASHTRA & KARNATAKA, INDIA IN TWO PACKAGES (i)RVNL/Pune/BHIGVAN-SOLAPUR,Package-1:-“Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works i.e. TSS at PAREWADI, KURDUWADI and MOHOL, associated Signalling & Telecommunication Work, Civil engineering work i.e. service buildings, quarters, sidings and Electrical General services works for Railway Electrification between Bhigvan - Solapur Section etc. 160 RKM / 385 TKM of Solapur Division of Central Railway, in the state of Maharashtra, India.” (ii)RVNL/Pune/SOLAPUR-GULBARGA,Package-2:-“Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works i.e. TSS at HOTGI, and Gaudgaon, associated Signalling & Telecommunication Work, Civil engineering work i.e. service buildings, quarters, sidings and Electrical General services works for Railway Electrification between Solapur – GULBARGA Section etc. 113 RKM / 261 TKM of Solapur Division of Central Railway, in the state of Maharashtra & Karnataka, India”Opening Date for Sale
14-06-2018

Closing Date
& Time for Sale

30-07-2018
05.00 PM
 
Download File
20180055Construction of Railway Flyover along with foundation, substructure, provision of new composite PSC slab and related works on existing alignment, construction of subway in lieu of Level crossing along with casting of RCC box bridges, earthwork and blanketing on approaches and other allied works in connection with Gauge conversion of Sabarmati-Botad section in Bhavnagar Division of Western Railway in Gujarat State, IndiaOpening Date for Sale
16-06-2018

Closing Date
& Time for Sale

06-08-2018
05.00 PM
 
Download File
20180056Project Management Consultancy Services for the works of Construction of PEB Sheds, Structures, Buildings, Water supply arrangement, Drainage, Sewerage, Road works, Rail track works, Signaling & Telecommunication works, OHE and Power supply arrangements, General Electrical works and Supply, Installation and commissioning of Machinery and Plant in connection with setting up of Rail Coach Factory at Latur, Maharashtra (India). Opening Date for Sale
19-06-2018

Closing Date
& Time for Sale

06-08-2018
05.00 PM
 


02-07-2018

Download File
20180057Project Management Consultancy Services for the works of Construction of PEB shed, structure, building, water supply arrangement, drainage, sewerage, road works, track works, power supply and general electrical works, OHE works, signal & telecommunication works and supply, installation and commissioning of machinery and plant in connection with setting up of Electric Loco Shed at Saiyedpur Bhitri, Uttar Pradesh (India) Opening Date for Sale
19-06-2018

Closing Date
& Time for Sale

03-08-2018
05.00 PM
 


29-06-2018

Download File
20180058CONSTRUCTION OF DOUBLE LINE BALLAST LESS TRACK FOR ELEVATED VIADUCT AND EMBANKMENT PORTION BETWEEN KAVI SUBHASH (NEW GARIA) TO VIP BAZAAR (EX) METRO STATIONS (FROM CH 838 M TO CH 7000 M) INCLUDING POINTS AND CROSSING ETC. IN CONNECTION WITH AIRPORT GARIA METRO CORRIDOROpening Date for Sale
22-06-2018

Closing Date
& Time for Sale

02-08-2018
05.00 PM
 
Download File
20180059“DETAILED DESIGN AND PROJECT MANAGEMENT CONSULTANCY FOR CONSTRUCTION OF TUNNELS FROM CHAINAGE KM 3+500 TO KM 20+000 AND WORKS RELATED TO MINOR BRIDGES AND FORMATION ON APPROACHES OF SUCH TUNNELS IN CONNECTION WITH NEW SINGLE LINE BROAD GAUGE RAIL LINK BETWEEN BHANUPALI-BILASPUR-BERI IN THE STATE OF PUNJAB AND HIMACHAL PRADESH, INDIA.”Opening Date for Sale
05-07-2018

Closing Date
& Time for Sale

05-09-2018
05.00 PM
 
Download File
20180060

Project Management Consultancy Services for “Construction of Road bed, Important, Major & Minor Bridges, RUBs, Platforms, Buildings, Supply of ballast, Supply and Installation of track (excluding supply of rails and track sleepers), Provision of OHE, signalling and Telecommunication works from Tori (excluding) Km 185.30 to Patratu (including) Km 120.83 Total 64.47 Kms Package-5, in connection with Sonnangar –Patratu 3rd line Project in the state of Jharkhand India”. 

Opening Date for Sale
06-07-2018

Closing Date
& Time for Sale

24-08-2018
05.00 PM
 
Download File
20180061

CONSTRUCTION OF ADITS 6 (1131 m Long) ON TUNNEL T-11 , 6A (392m Long) ON TUNNEL T-12 AND ADIT 7(709m) ON TUNNEL-13 IN CONNECTION WITH NEW SINGLE BROAD GUAGE RAIL LINK BETWEEN RISHIKESH AND KARANPRAYAG (125KM) IN THE STATE OF UTTARAKHAND, INDIA.

Opening Date for Sale
09-07-2018

Closing Date
& Time for Sale

23-08-2018
05.00 PM
 
Download File
20180062

DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF INDOOR AND OUTDOOR SIGNALLING AND TELECOMMUNICATION WORKS IN VIRBHADRA – NEW RISHIKESH SECTION IN CONNECTION WITH NEW LINE BETWEEN RISHIKESH – KARANPRAYAG IN MORADABAD DIVISION OF NORTHERN RAILWAY.

Opening Date for Sale
09-07-2018

Closing Date
& Time for Sale

23-08-2018
05.00 PM
 
Download File
20180063

Construction of Roadbed, Major and Minor Bridges, RUBs, ROBs, Track Linking (excluding supply of rails and main line sleepers) and General Electrical Works in connection with New BG Line from Neora (including) to Jatdumri (excluding) (18.4 Km) on Danapur Division of East Central Railway in Bihar, India

Opening Date for Sale
10-07-2018

Closing Date
& Time for Sale

23-08-2018
05.00 PM
 
Download File
20180064

PAMBAN BRIDGE: Construction of movable vertical lift steel bridge including substructure in lieu of existing Scherzer rolling lift span (span no. 114) of Br. no. 346 at KM 655/000 – 657/200 between Mandapam and Pamban stations in Madurai Division of Southern Railway in the state of Tamil Nadu, India

Opening Date for Sale
17-07-2018

Closing Date
& Time for Sale

30-08-2018
05.00 PM
 
Download File
20180065

General Electrification Works of Station & other Service Buildings, Platforms, Platform Shelters, FOBs, LC Gate, Yards and other installations including alterations to the existing Service connections between Virbhadra (inclusive) and New Rishikesh (inclusive) (Km 0.000 to 5.700) and Lift & Escalator work at New Rishikesh Station in Moradabad Division of Northern Railway in connection with Rishikesh-Karanprayag New BG Railway line Project.

IFB No. : RVNL/RKSH/T/W/GE/PK-1A/191

Opening Date for Sale
18-07-2018

Closing Date
& Time for Sale

16-08-2018
05.00 PM
 
Download File