Home » Tenders » Active Tenders

Active Tenders

ID Subject Date & Time If Updated Download
20170056Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers,Thick Web Switches and Special Sleepers) S&T and OHE & General Electrical Work in connection with Extension of MMTS Phase-II (Tripling) from Ghatkesar (Km. 213.840) to Raigir (Yadadri) (Km. 246.230) on Secunderabad Kazipet Section of Secunderabad Division of South Central Railway, Telangana State, India (33 Kms). Opening Date for Sale
12-09-2017

Closing Date
& Time for Sale

31-08-2018
05.00 PM
 


28-06-2018

Download File
20170057

Project Management Consultancy for Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers, Thick Web Switches and Special Sleepers) S&T and OHE & General Electrical Work in connection with Extension of MMTS Phase-II (Tripling) from Ghatkesar (Km. 213.840) to Raigir (Yadadri) (Km. 246.230) on Secunderabad  Kazipet Section of Secunderabad Division of South Central Railway, Telangana State, India (33 Kms).

Opening Date for Sale
15-09-2017

Closing Date
& Time for Sale

27-09-2018
05.00 PM
 


30-07-2018

Download File
20170059

Detailed Design and Project Management Consultancy for Construction of Tunnels, Bridges, and Formation Works from Chainage 63+414 to 73+019 (9.596 km) under package-5 in connection with new single line broad gauge rail link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India.

RFP No./RVNL/RKSH-KNPG/2017/DD&PMC/PK-5 dated 12.09.2017

Opening Date for Sale
18-09-2017

Closing Date
& Time for Sale

13-08-2018
05.00 PM
 


23-07-2018

Download File
20180054

EXECUTION OF RAILWAY ELECTRIFICATION OF BHIGVAN - SOLAPUR 160 RKM / 385 TKM AND SOLAPUR – GULBARGA 113 RKM / 261 TKM (SECTION OF PUNE-WADI-GUNTKAL RE WORK) SECTION IN SOLAPUR DIVISION OF CENTRAL RAILWAY, IN THE STATE OF MAHARASHTRA & KARNATAKA, INDIA IN TWO PACKAGES (i)RVNL/Pune/BHIGVAN-SOLAPUR,Package-1:-“Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works i.e. TSS at PAREWADI, KURDUWADI and MOHOL, associated Signalling & Telecommunication Work, Civil engineering work i.e. service buildings, quarters, sidings and Electrical General services works for Railway Electrification between Bhigvan - Solapur Section etc. 160 RKM / 385 TKM of Solapur Division of Central Railway, in the state of Maharashtra, India.” (ii)RVNL/Pune/SOLAPUR-GULBARGA,Package-2:-“Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works i.e. TSS at HOTGI, and Gaudgaon, associated Signalling & Telecommunication Work, Civil engineering work i.e. service buildings, quarters, sidings and Electrical General services works for Railway Electrification between Solapur – GULBARGA Section etc. 113 RKM / 261 TKM of Solapur Division of Central Railway, in the state of Maharashtra & Karnataka, India”

Opening Date for Sale
14-06-2018

Closing Date
& Time for Sale

18-08-2018
05.00 PM
 


07-08-2018

Download File
20180055

Construction of Railway Flyover along with foundation, substructure, provision of new composite PSC slab and related works on existing alignment, construction of subway in lieu of Level crossing along with casting of RCC box bridges, earthwork and blanketing on approaches and other allied works in connection with Gauge conversion of Sabarmati-Botad section in Bhavnagar Division of Western Railway in Gujarat State, India

Opening Date for Sale
16-06-2018

Closing Date
& Time for Sale

27-08-2018
05.00 PM
 


10-08-2018

Download File
20180058

CONSTRUCTION OF DOUBLE LINE BALLAST LESS TRACK FOR ELEVATED VIADUCT AND EMBANKMENT PORTION BETWEEN KAVI SUBHASH (NEW GARIA) TO VIP BAZAAR (EX) METRO STATIONS (FROM CH 838 M TO CH 7000 M) INCLUDING POINTS AND CROSSING ETC. IN CONNECTION WITH AIRPORT GARIA METRO CORRIDOR

Opening Date for Sale
22-06-2018

Closing Date
& Time for Sale

27-09-2018
05.00 PM
 


16-08-2018

Download File
20180059

“DETAILED DESIGN AND PROJECT MANAGEMENT CONSULTANCY FOR CONSTRUCTION OF TUNNELS FROM CHAINAGE KM 3+500 TO KM 20+000 AND WORKS RELATED TO MINOR BRIDGES AND FORMATION ON APPROACHES OF SUCH TUNNELS IN CONNECTION WITH NEW SINGLE LINE BROAD GAUGE RAIL LINK BETWEEN BHANUPALI-BILASPUR-BERI IN THE STATE OF PUNJAB AND HIMACHAL PRADESH, INDIA.”

Opening Date for Sale
05-07-2018

Closing Date
& Time for Sale

05-09-2018
05.00 PM
 


31-07-2018

Download File
20180060

Project Management Consultancy Services for “Construction of Road bed, Important, Major & Minor Bridges, RUBs, Platforms, Buildings, Supply of ballast, Supply and Installation of track (excluding supply of rails and track sleepers), Provision of OHE, signalling and Telecommunication works from Tori (excluding) Km 185.30 to Patratu (including) Km 120.83 Total 64.47 Kms Package-5, in connection with Sonnangar –Patratu 3rd line Project in the state of Jharkhand India”. 

Opening Date for Sale
06-07-2018

Closing Date
& Time for Sale

24-08-2018
05.00 PM
 


08-08-2018

Download File
20180061

CONSTRUCTION OF ADITS 6 (1131 m Long) ON TUNNEL T-11 , 6A (392m Long) ON TUNNEL T-12 AND ADIT 7(709m) ON TUNNEL-13 IN CONNECTION WITH NEW SINGLE BROAD GUAGE RAIL LINK BETWEEN RISHIKESH AND KARANPRAYAG (125KM) IN THE STATE OF UTTARAKHAND, INDIA.

IFB No: RVNL/RKSH-KNPG/TENDER/ADITS/PK6/               Date:09/07/2018

Opening Date for Sale
09-07-2018

Closing Date
& Time for Sale

24-08-2018
05.00 PM
 


13-08-2018

Download File
20180062

DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF INDOOR AND OUTDOOR SIGNALLING AND TELECOMMUNICATION WORKS IN VIRBHADRA – NEW RISHIKESH SECTION IN CONNECTION WITH NEW LINE BETWEEN RISHIKESH – KARANPRAYAG IN MORADABAD DIVISION OF NORTHERN RAILWAY.

Opening Date for Sale
09-07-2018

Closing Date
& Time for Sale

23-08-2018
05.00 PM
 


01-08-2018

Download File
20180063

Construction of Roadbed, Major and Minor Bridges, RUBs, ROBs, Track Linking (excluding supply of rails and main line sleepers) and General Electrical Works in connection with New BG Line from Neora (including) to Jatdumri (excluding) (18.4 Km) on Danapur Division of East Central Railway in Bihar, India

Opening Date for Sale
10-07-2018

Closing Date
& Time for Sale

23-08-2018
05.00 PM
 


30-07-2018

Download File
20180064

PAMBAN BRIDGE: Construction of movable vertical lift steel bridge including substructure in lieu of existing Scherzer rolling lift span (span no. 114) of Br. no. 346 at KM 655/000 – 657/200 between Mandapam and Pamban stations in Madurai Division of Southern Railway in the state of Tamil Nadu, India

Opening Date for Sale
17-07-2018

Closing Date
& Time for Sale

30-08-2018
05.00 PM
 
Download File
20180065

General Electrification Works of Station & other Service Buildings, Platforms, Platform Shelters, FOBs, LC Gate, Yards and other installations including alterations to the existing Service connections between Virbhadra (inclusive) and New Rishikesh (inclusive) (Km 0.000 to 5.700) and Lift & Escalator work at New Rishikesh Station in Moradabad Division of Northern Railway in connection with Rishikesh-Karanprayag New BG Railway line Project.

IFB No. : RVNL/RKSH/T/W/GE/PK-1A/191

Opening Date for Sale
18-07-2018

Closing Date
& Time for Sale

16-08-2018
05.00 PM
 


23-07-2018

Download File
20180066

‘Execution of Third line between Jimidipeta (incl)-bobbili(incl) and Bobbili (excl)-Gotlam(incl)  – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails, and BG main line sleepers), Electrical  (Railway Electrification and General Electrification), signalling and telecommunication works in Waltair Division of East coast Railway, Odisha and Andhra Pradesh , India in 2 ( two ) Packages 

Opening Date for Sale
23-07-2018

Closing Date
& Time for Sale

27-09-2018
05.00 PM
 
Download File
20180067

Detailed Design & Drawing of foundation, substructure & Superstructure and River Training/Protection works of Rail Bridge (Br. no. 8) over river Alakananda at Lachmoli in connection with Rishikesh-Karanprayag New BG Rail Line Project in the state of Uttarakhand, India.

Opening Date for Sale
24-07-2018

Closing Date
& Time for Sale

23-08-2018
05.00 PM
 
Download File
20180068

Detailed Design and Project Management Consultancy for Construction of Tunnels, Bridges, and Formation Works from Chainage 6+015 to 18+444 (12.429km) under Package-1 in Connection with new Single Line Broad Gauge Rail Link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India

Opening Date for Sale
24-07-2018

Closing Date
& Time for Sale

30-08-2018
05.00 PM
 
Download File
20180069

Execution of “Casting of precast RCC Boxes and making them available near the bridges at nominated places in connection with rebuilding of stone slab bridges in KBJ-LAE section of E.Co.Railway IN CHHATTISGARH AND ODISHA STATE, INDIA”.

Opening Date for Sale
30-07-2018

Closing Date
& Time for Sale

04-09-2018
05.00 PM
 
Download File
20180070

Construction of Bituminous Road for closure of level crossing by road diversion works between STP-MLN section on Lucknow division of North Eastern Railway In Uttar Pradesh, India 

IFB No. RVNL/PO-LKO/STP-MLN/Diversion Road/262

Opening Date for Sale
03-08-2018

Closing Date
& Time for Sale

29-08-2018
05.00 PM
 
Download File
20180071

Detailed Design and Project Management Consultancy for Construction of Tunnels, Bridges, Yard and Formation Works from Chainage 73+489 to 83+899 (10.410km) under Package-6 in Connection with new Single Line Broad Gauge Rail Link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India

Opening Date for Sale
02-08-2018

Closing Date
& Time for Sale

10-09-2018
05.00 PM
 
Download File
20180072

Detailed Design and Project Management Consultancy for Construction of Tunnels, Bridges, Yard and Formation Works from Chainage 83+899 to 101+310 (17.411km) under Package-7 in Connection with new Single Line Broad Gauge Rail Link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India

Opening Date for Sale
02-08-2018

Closing Date
& Time for Sale

17-09-2018
05.00 PM
 
Download File
20180073

Detailed Design and Project Management Consultancy for Construction of Tunnels, Bridges, Yard and Formation Works from Chainage 101+310 to 117+365 (16.055km) under Package-8 in Connection with new Single Line Broad Gauge Rail Link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India

Opening Date for Sale
02-08-2018

Closing Date
& Time for Sale

24-09-2018
05.00 PM
 
Download File
20180074

Detailed Design and Project Management Consultancy for Construction of Tunnels, Bridges, Yard and Formation Works from Chainage 117+365 to 125+320 (7.955km) under Package-9 in Connection with new Single Line Broad Gauge Rail Link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India

RFP No./RVNL/RKSH-KNPG/2018/DD&PMC/PK-9 dated 31.07.2018 

Opening Date for Sale
02-08-2018

Closing Date
& Time for Sale

03-10-2018
05.00 PM
 
Download File
20180075

“Construction of Rail Bridge No- 9 with Span arrangement of 15 x 30.5m Composite steel girder at CH: 73+253.8m and construction of steel through girder Road Bridge with span arrangement of 2x110m with extended viaduct over river Alaknanda at Srinagar including other ancillary works like river training, protection works etc. in connection with Rishikesh - Karanprayag New BG Rail line Project in the state of Uttarakhand, India.”

IFB No: RVNL/RKSH/T/W/Rail & Road Br./190              Date : 07/08/2018

Opening Date for Sale
07-08-2018

Closing Date
& Time for Sale

19-09-2018
05.00 PM
 
Download File
20180076

Execution of the work of track linking (excluding supply of rails, thick web switches and PSC line sleeper), Laying of turnouts, SEJ, OHE, S&T and other allied works from Kendrapara (km 43.873) to Paradeep (km 81.20) excluding Kendrapara yard in connection with construction of new BG railway line from Haridaspur to Paradeep (km 81.200) in Khurda Road Division of East Coast Railway in the State of Odisha, India. 

Opening Date for Sale
08-08-2018

Closing Date
& Time for Sale

17-09-2018
05.00 PM
 
Download File
20180077

“Construction of two lane Road bridge, Bow string steel Arch structure (Approx 125 Mtr long and 7.50 Mtr wide with 1.50 Mtr pedestrians path both side) over river Alaknanda at Sevai-Kaleshwar (Karnprayag) and construction of two lane road bridge, open web through girder (Approx. 110m and 7.50 Mtr Carriageway) at Gauchar over river Alaknanda including other ancillary works in connection with 125 Km long BG New Rail Link between Rishikesh and Karanprayag in Uttarakhand State, India.”

IFB No: RVNL/RKSH/W/Road Br./226

Date: 08/08/2018

 
Opening Date for Sale
08-08-2018

Closing Date
& Time for Sale

18-09-2018
05.00 PM
 
Download File
20180078

DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF  SIGNALLING AND TELECOMMUNICATIONS WORKS IN CONNECTION WITH DOUBLING OF TINAIGHAT- CASTLE ROCK SECTION OF HUBBALI DIVISION OF SOUTH WESTERN RAILWAY IN UTTARA KANNADA DISTRICT IN KARNATAKA STATE, INDIA

Opening Date for Sale
10-08-2018

Closing Date
& Time for Sale

26-09-2018
05.00 PM
 
Download File
20180079

PROJECT MANAGEMENT CONSULTANCY FOR Construction of Adits 6 (1131m long), 6A (392m long), and 7 (709m long) on Tunnels 11, 12 & 13 respectively in connection with new single line broad gauge Rail link between Rishikesh and Karanprayag (125km) in the State of Uttarakhand, India.

IFB No: RVNL/RKSH-KNPG/TENDER/ADITS /2/PM

DATED:  14/08/2018

Opening Date for Sale
14-08-2018

Closing Date
& Time for Sale

13-09-2018
05.00 PM
 
Download File